六六字典>英语词典>backlog翻译和用法

backlog

英 [ˈbæklɒɡ]

美 [ˈbæklɔːɡ]

n.  积压的工作
vt.  (使)积压; 储存

复数:backlogs 过去分词:backlogged 现在分词:backlogging 过去式:backlogged 第三人称单数:backlogs 

BEC计算机

Collins.1 / BNC.14585 / COCA.14476

牛津词典

    noun

    • 积压的工作
      a quantity of work that should have been done already, but has not yet been done

      柯林斯词典

      • N-COUNT 积压的事情;未完成的工作
        Abacklogis a number of things which have not yet been done but which need to be done.
        1. There is a backlog of repairs and maintenance in schools.
          对各学校的修缮和维护工作积压了一堆。

      英英释义

      noun

      • an accumulation of jobs not done or materials not processed that are yet to be dealt with (especially unfilled customer orders for products or services)
        1. something kept back or saved for future use or a special purpose
            Synonym:reservestockpile
          1. the large log at the back of a hearth fire

            verb

            • accumulate and create a backlog

              双语例句

              • Sooner or later, this backlog of ST companies will have to be addressed.
                这批st企业迟早要得到处理。
              • The product backlog supersedes traditional requirements artifacts, such as market and product requirements specifications.
                产品待办事项列表代替了传统的需求文档,比如市场和产品的需求规格说明书。
              • Some teams estimate the size of all of the items in their backlog prior to any development.
                有些团队在任何开发之前都要对他们积压中所有条目的大小进行评估。
              • The project backlog is the specific set of work that is required for the project.
                项目backlog是项目需要做的具体的工作集合。
              • This will cause the operations backlog items to be higher priority on the backlog.
                这会导致运营相关的待办事项条目得到更高的优先级。
              • The product backlog items are estimated.
                产品待办事项列表中的待办项都是被估算过的。
              • But if the suppliers own products backlog, and will take the same way in online auctions.
                而且如果供货商自己的产品积压,也会采取同样的方式在网上拍卖。
              • It is normal to have a lot of user stories in your release backlog.
                在发行版的计划安排中,通常包含了大量的用户描述。
              • This list of tasks becomes the Sprint Backlog.
                任务的列表就成了所谓的代办冲刺。
              • During the sprint, the status of the work items in the Sprint Backlog is updated daily.
                在冲刺期间,SprintBacklog中工作项目的状态每日都会得到更新。